AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Apr 05, 2010

AD: Boeing

AD NUMBER: 2010-07-03

MANUFACTURER: The Boeing Company Model 747-200C and - 200F Series Airplanes
SUBJECT: Airworthiness Directive 2010-07-03

SUMMARY: The FAA is superseding an existing airworthiness directive (AD), which applies to certain Model 747-200C and -200F series airplanes. That AD currently requires repetitive inspections to find fatigue cracking in the floor panel attachment fastener holes of the upper chord of certain upper deck floor beams in Section 41 (i.e., body station 520 and forward), and repair if necessary. The existing AD also provides optional modifications, which extend the threshold for initiating certain repetitive inspections. This new AD requires additional repetitive inspections to find fatigue cracking in the floor panel attachment fastener holes of the upper chord of certain other upper deck floor beams in Section 41 and Section 42 (i.e., aft of body station 520); repetitive inspections to find fatigue cracking in the permanent fastener holes of the upper chord of certain upper deck floor beams in Section 41; and related investigative and corrective actions. This new AD also provides a new optional modification, which terminates certain repetitive inspections. This AD results from new reports of cracking in the upper chord of the upper deck floor beams in Sections 41 and 42, and new analysis that shows the permanent fastener holes of the upper chord of certain upper deck floor beams in Section 41 are also susceptible to fatigue cracking. We are issuing this AD to detect and correct cracking in the upper chord of the upper deck floor beams. Such cracking could extend and sever the floor beams, which could result in rapid decompression and loss of controllability of the airplane.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/CC745B3DCD4E0CB5862576F900552839?OpenDocument

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC