AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Apr 05, 2010

AD: Boeing

AD NUMBER: 2010-07-03

MANUFACTURER: The Boeing Company Model 747-200C and - 200F Series Airplanes
SUBJECT: Airworthiness Directive 2010-07-03

SUMMARY: The FAA is superseding an existing airworthiness directive (AD), which applies to certain Model 747-200C and -200F series airplanes. That AD currently requires repetitive inspections to find fatigue cracking in the floor panel attachment fastener holes of the upper chord of certain upper deck floor beams in Section 41 (i.e., body station 520 and forward), and repair if necessary. The existing AD also provides optional modifications, which extend the threshold for initiating certain repetitive inspections. This new AD requires additional repetitive inspections to find fatigue cracking in the floor panel attachment fastener holes of the upper chord of certain other upper deck floor beams in Section 41 and Section 42 (i.e., aft of body station 520); repetitive inspections to find fatigue cracking in the permanent fastener holes of the upper chord of certain upper deck floor beams in Section 41; and related investigative and corrective actions. This new AD also provides a new optional modification, which terminates certain repetitive inspections. This AD results from new reports of cracking in the upper chord of the upper deck floor beams in Sections 41 and 42, and new analysis that shows the permanent fastener holes of the upper chord of certain upper deck floor beams in Section 41 are also susceptible to fatigue cracking. We are issuing this AD to detect and correct cracking in the upper chord of the upper deck floor beams. Such cracking could extend and sever the floor beams, which could result in rapid decompression and loss of controllability of the airplane.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/CC745B3DCD4E0CB5862576F900552839?OpenDocument

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC