'Workhorse' Becomes First F-35 To Achieve 1,000 Flight Hours | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jun 24, 2014

'Workhorse' Becomes First F-35 To Achieve 1,000 Flight Hours

USAF Says Aircraft's Primary Mission Is 'Envelope Expansion'

AF-2, the second production F-35 Lightning II for the Air Force, became the first F-35 to reach 1,000 flight hours June 11. Paul Hattendorf, a Lockheed Martin test pilot, was flying an airframe loads envelope expansion mission when the fighter reached the milestone.

"AF-2's nickname is 'Workhorse,'” said Randy Thompson, the F-35 Integrated Test Force, government air vehicle lead. "It continues to carry the Flight Sciences testing load, executing its primary mission of loads envelope expansion. Every AF-2 flight-test hour moves the JSF (Joint Strike Fighter) enterprise closer to providing our warriors with the Air Force Initial Operational Capability (IOC) and final system development and demonstration maneuvering envelopes.”

Thompson added that data collected from all Flight Sciences aircraft help refine the airframe usage spectrum, which in turn allows for a more accurate fleet life determination. "AF-2 is the ‘Pull Gs jet,'” Thompson said. “It was the first aircraft to hit + 9 G and -3 G and to roll at design-load factor. In addition, AF-2 is the first F-35A to intentionally fly in significant airframe buffet at all angles of attack."

Both AF-2 and AF-1 ferried to Edwards Air Force Base, CA from the Lockheed Martin plant in Fort Worth, Texas, May 17, 2010. Thompson said AF-2 has specific instrumentation and was calibrated for in-flight loads measurements prior to ferrying to Edwards AFB. In addition, it is instrumented to execute airframe buffet testing; landing, braking and arresting hook testing; and ground and in-flight gun testing.

The Lightning II software has 24 million lines of code, which is continually being updated and improved. The ITF team, AF-2 and the rest of the Edwards AFB F-35 test fleet, continues to get closer in getting the world's most advanced fighter into the hands of the warfighter. "The entire F-35 Edwards ITF team and the 412th Test Wing are pressing hard to complete testing required for the 2B fleet release (Marine Corp IOC mission systems software release and Air Force IOC maneuvering envelope release),” Thompson said. “As aircraft compete their slated 2B testing, the team moves ahead with testing required for the final SDD clearances. Post 2B testing milestones include putting the final SDD talons on the Lightning II with the first flight of the small diameter bomb, first gun fire and continued external GBU-12 envelope expansion, as well as beginning to test the final SDD mission systems suite," Thompson said.

The planned time frame for the Air Force IOC of its F-35As is August 2016.

(USAF image)

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC