SpaceX Delays Red Dragon Mission To Mars | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Feb 21, 2017

SpaceX Delays Red Dragon Mission To Mars

Lander Will Not Be Ready In 2018 As The Company Had Hoped

SpaceX has pushed its planned launch of an unmanned probe to Mars two years into the future, according to SpaceX president Gwynne Shotwell.

Speaking at a pre-launch briefing at NASA's Launch Complex 39A at the Kennedy Space Center, Shotwell said that the robotic lander dubbed Red Dragon will not be ready in 2018 as the company had planned.

Engadget reports that Shotwell said that the company needs to "needed to put more resources and focus more heavily on our crew program and our Falcon Heavy program." That is pushing the Mars mission into the "2020 timeframe."

That's still better than the original plan which had Red Dragon heading to Mars in 2022. That target had been revised to 2018.

Red Dragon is being developed to test systems and techniques the company will eventually use to send a equipment and supplies to Mars in advance of a possible manned mission.

(Image from NASA video)

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC