TSB Report From 2014 'Hard Landing' In Jamaica | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jan 11, 2017

TSB Report From 2014 'Hard Landing' In Jamaica

Unstable Approach Led To The Incident Involving An Air Canada Rouge Flight

The has Transportation Safety Board of Canada (TSB) determined that an unstable approach led to the 10 May 2014 hard landing of an Air Canada Rouge Airbus A319 at the Sangster International Airport in Montego Bay, Jamaica.

There were no injuries and no structural damage to the aircraft.

The TSB said in its report that the Air Canada Rouge Airbus A319 was operating as flight AC1804 from Toronto, Ontario, to Montego Bay, Jamaica, with 131 passengers and 6 crew members on board. At approximately 14 minutes before touchdown, the aircraft was cleared for a non-precision approach to Runway 07 at the Montego Bay airport. The approach became unstable and the aircraft touched down hard. The landing subjected the main landing gear to very high loading. The aircraft was subsequently inspected and the main landing gear shock absorbers were replaced as a precaution.

The investigation determined that the approach became unstable as a result of inconsistent airspeed management and delayed configuration of the aircraft for landing. The flight crew did not adhere to standard operating procedures, which required the monitoring of all available parameters during approach and landing.  The investigation also found that simulator training to recognize an unstable approach leading to a missed approach had not been provided. As such, the flight crew did not recognize the instability of the approach and continued it well beyond the point at which a missed approach and go-around should have been initiated.

If flight crews do not follow standard procedures and best practices that facilitate the monitoring of stabilized approach criteria and excessive parameter deviations, there is a risk that undesired aircraft states will be mismanaged. Unstable approaches are one of the key safety issues on the 2016 TSB Watchlist. There is also an outstanding Board recommendation (A14-01) calling for Transport Canada to require airlines to monitor and reduce unstable approaches that continue to a landing.

Following the occurrence, Air Canada Rouge refined its stable-approach policy, modified its training to include more manual flying scenarios and incorporated simulator training for unstable approaches leading to a missed approach.

(Source: TSB. Image included in TSB report)

FMI: Full Report

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC