King Stallion Lifts First External Load | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Apr 22, 2016

King Stallion Lifts First External Load

Flight Conducted At Sikorsky Test Center In Florida

 Lockheed Martin's CH-53K helicopter has achieved its first external lift flight by successfully carrying a 12,000 pound external load.

"Achieving our first external lift signifies another milestone for the CH-53K program," said Mike Torok, Sikorsky's Vice President of CH-53K Programs. "Our flight envelope expansion efforts remain on track, and we continue to make good progress toward our initial operational test assessment later this year, and ultimately full aircraft system qualification."

The first two CH-53K heavy lift helicopters achieved their first flights on October 27, 2015, and January 22, 2016, respectively. To date these helicopters have achieved over 50 flight hours combined including one flight at speeds over 140 knots.   The third and fourth King Stallion aircraft will join the flight test program this summer.

As the King Stallion flight test program proceeds, both of the current flying aircraft will be exercised to expand the external load envelope. Initial external payloads weighing 12,000 pounds will be flown first in hover and then incrementally to speeds up to 120 knots.  The aircraft will then carry 20,000 and 27,000 pound external payloads.

The CH-53K King Stallion is equipped with single, dual and triple external cargo hook capability that will allow for the transfer of three independent external loads to three separate landing zones in support of distributed operations in one single sortie without having to return to a ship or other logistical hub.  The three external cargo hooks include a single center point hook with a 36,000 lb. capability and dual-point hooks each capable of carrying up to 25,200 lbs. The system features an electrical load release capability from the cockpit and cabin, and a mechanical load release capability at each of the pendant locations.  An auto-jettison system is incorporated to protect the aircraft in the event of a load attachment point failure.

"It is exciting to have achieved our first external lift, another important step towards fielding the most powerful U.S. military helicopter," said Col. Hank Vanderborght, U.S. Marine Corps Program Manager for Heavy Lift Helicopters. "Our program continues on pace to deploy this incredible heavy lift capability to our warfighters."

Sikorsky Aircraft, a Lockheed Martin company, is developing the CH-53K King Stallion heavy lift helicopter for the U.S. Marine Corps. The King Stallion maintains similar physical dimensions and "footprint" as its predecessor, the three-engine CH-53E SUPER STALLION helicopter, but will more than triple the payload to 27,000 pounds over 110 nautical miles under "high hot" ambient conditions.

Features of the CH-53K helicopter include a modern glass cockpit; fly-by-wire flight controls; fourth-generation rotor blades with anhedral tips; a low maintenance elastomeric rotor head; upgraded engines; a locking, United States Air Force pallet compatible cargo rail system; external cargo handling improvements; survivability enhancements; and improved reliability, maintainability and supportability.

The U.S. Department of Defense's Program of Record remains at 200 CH-53K aircraft. The Marine Corps intends to stand up eight active duty squadrons, one training squadron, and one reserve squadron to support operational requirements.

This press release contains forward looking statements concerning opportunities for development, production and sale of helicopters. Actual results may differ materially from those projected as a result of certain risks and uncertainties, including but not limited to changes in government procurement priorities and practices, budget plans, availability of funding and in the type and number of aircraft required; challenges in the design, development, production and support of advanced technologies; as well as other risks and uncertainties including but not limited to those detailed from time to time in Lockheed Martin Corporation's Securities and Exchange Commission filings.

(Image provided with Lockheed Martin news release)

MFI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC