Boeing Completes P-8A Poseidon Loads Calibration Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Mar 22, 2009

Boeing Completes P-8A Poseidon Loads Calibration Testing

Trials Performed Ahead of Schedule

Boeing last week completed loads calibration testing of the first P-8A Poseidon test aircraft, two weeks ahead of schedule. Loads calibration is one of the prerequisites for the US Navy flight clearance process.

During the tests, up to 80 percent of the highest expected flight loads were applied to the aircraft's fuselage, horizontal stabilizers, vertical fin and wing structures. Completion of loads calibration ensures that test aircraft T-1 is ready for airworthiness testing, which will commence later this year.

"One of the reasons we were able to complete the tests ahead of schedule is that the team incorporated some new technologies which enabled us to capture more accurate and more usable data faster," said Mark Magnuson, Boeing P-8A Structural Development and Certification director. "We also completed a number of independent reviews of the test plan prior to the start of testing, in order to reduce risk."

One of the new technologies, optical photogrammetry, entailed installing small video cameras on the P-8A's leading and trailing edges and underneath the fuselage. The measurement system provided three-dimensional, real-time data.

The team now will restore T-1 to its flight configuration and perform additional systems tests prior to first flight.

The P-8A is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems and GE Aviation. The team currently is assembling and testing the first five P-8As, based off Boeing's 737-800 commercial airliner.

The Navy plans to purchase 108 P-8A long-range maritime reconnaissance and anti-submarine warfare aircraft to replace its fleet of P-3C Orions. Initial operational capability is slated for 2013.

As ANN reported, last week the US State Department approved the sale of three P-8I derivatives to the Indian navy -- the first of what Boeing hopes will be more international orders for the surveillance plane.

FMI: www.boeing.com/ids

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC