U.S. Marine Corps Has An Aviation Plan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 13, 2022

U.S. Marine Corps Has An Aviation Plan

U.S. Marine Corps (USMC) Has A Plan For Aviation ‘Force Design 2030’

In a 200+ page document, the USMC’s Deputy Commandant for Aviation, Lt Gen Mark R. Wise outlined what they deemed an aggressive plan to evolve the USMC’s aviation division to play a key role in the force’s future. The ‘Force Design 2030’ is a roadmap they hope will help them transition the USMC into “a more agile expeditionary force.” The doctrine serves as a foundation to describe the forward-looking desired capabilities and concepts that will continue to provide a “warfighting advantage.”

‘Force Design 2030’ not only addresses its land, sea, and airborne assets, but also the human side, restructuring the organizational hierarchy from a linear to functional capabilities-based divisions, while moving away from a hierarchical system to a dynamic one in an effort to achieve greater agility, essentially decentralized units with decision-making authority at the lowest levels. The Force Design 2030 promises operation from austere distributed locations…across extended distances…minimally sustained…fully networked…and interoperable with the Join Force, America’s allies and partners.”

The plan uses the Cunningham Group Organizational structure, a 3-division unit that supports the assessment and planning for the USMC Aviation: 1) Future Capabilities, 2) Strategy & Wargaming, and 3) Operational Readiness, and it appears that the functional capabilities are aligned according to these three areas. In an interesting twist, their construction plan represents a philosophical shift from purpose-built to standard-built, which facilitates agility in unit laydown and deployments while also reducing dependency on specific home-basing locations, but more importantly, improve cost and resiliency.

FMI: https://marines.mil

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC