Forensic Testing Being Done On Endeavour Load Control Assembly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, May 05, 2011

Forensic Testing Being Done On Endeavour Load Control Assembly

New LCA Box Has Been Installed Aboard The Orbiter

Technicians at the NASA Shuttle Logistic Depot in Cape Canaveral, FL, are doing additional forensic engineering testing on a faulty power distribution box, called a Load Control Assembly 2 (LCA-2). It was removed Tuesday morning from the aft compartment of space shuttle Endeavour on Launch Pad 39A at NASA?s Kennedy Space Center.

Technicians are trying to determine what caused the power box to fail. Initial testing shows a driver (circuit) inside the LCA-2 shorted out. The LCA-2 feeds power to heaters on the fuel line for Endeavour's auxiliary power unit-1 (APU-1). Initially, when the shorted out driver was replaced, the LCA-2 appeared to worked as designed.

Technicians are performing additional failure analysis on the driver to confirm whether the short experienced by the system came from inside or outside the LCA-2. Depending on the results, additional testing of the box may be required. On Launch Pad 39A, a new LCA-2 box was installed into Endeavour Wednesday morning, and technicians are preparing to retest the system before Endeavour's next launch attempt is scheduled. Currently, Endeavour's no earlier than launch date remains May 10.

The APU-1 fuel line heaters did not work on April 29, prompting the launch team to scrub the Endeavour's first launch attempt for the STS-134 mission to the International Space Station.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC