Forensic Testing Being Done On Endeavour Load Control Assembly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, May 05, 2011

Forensic Testing Being Done On Endeavour Load Control Assembly

New LCA Box Has Been Installed Aboard The Orbiter

Technicians at the NASA Shuttle Logistic Depot in Cape Canaveral, FL, are doing additional forensic engineering testing on a faulty power distribution box, called a Load Control Assembly 2 (LCA-2). It was removed Tuesday morning from the aft compartment of space shuttle Endeavour on Launch Pad 39A at NASA?s Kennedy Space Center.

Technicians are trying to determine what caused the power box to fail. Initial testing shows a driver (circuit) inside the LCA-2 shorted out. The LCA-2 feeds power to heaters on the fuel line for Endeavour's auxiliary power unit-1 (APU-1). Initially, when the shorted out driver was replaced, the LCA-2 appeared to worked as designed.

Technicians are performing additional failure analysis on the driver to confirm whether the short experienced by the system came from inside or outside the LCA-2. Depending on the results, additional testing of the box may be required. On Launch Pad 39A, a new LCA-2 box was installed into Endeavour Wednesday morning, and technicians are preparing to retest the system before Endeavour's next launch attempt is scheduled. Currently, Endeavour's no earlier than launch date remains May 10.

The APU-1 fuel line heaters did not work on April 29, prompting the launch team to scrub the Endeavour's first launch attempt for the STS-134 mission to the International Space Station.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC