AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Aug 21, 2018

AD: Airbus SAS Airplanes

AD NUMBER: 2018-17-10

PRODUCT: Certain Airbus Model A300 B4-600R series airplanes, Model A300 C4-605R Variant F airplanes, and Model A300 F4-600R series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-15-17, which applied to the airplanes listed above.

AD 2017-15-17 required an inspection of the lower area of a certain frame (FR) radius for cracking, and corrective action if necessary. This AD requires new repetitive inspections of the forward fitting lower radius of a certain frame for cracking, and corrective actions if necessary.

This AD was prompted by a determination that repetitive inspections and applicable corrective actions are necessary.

DATES: This AD is effective September 24, 2018.

COST: The FAA estimates that  this AD affects 94 airplanes of U.S. registry.

  • The actions required by AD 2017-15-17, and retained in this AD, take about 4 work-hours per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2017-15-17 is $340 per product.
  • The FAA also estimates that it takes about 4 work-hours per product to comply with the new requirements of this AD, including 1 work-hour per product for reporting. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of this AD on U.S. operators to be $425 per product.
  • The agency has received no definitive data that enables it to provide cost estimates for the on-condition actions specified in this AD.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC