AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Aug 21, 2018

AD: Airbus SAS Airplanes

AD NUMBER: 2018-17-10

PRODUCT: Certain Airbus Model A300 B4-600R series airplanes, Model A300 C4-605R Variant F airplanes, and Model A300 F4-600R series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-15-17, which applied to the airplanes listed above.

AD 2017-15-17 required an inspection of the lower area of a certain frame (FR) radius for cracking, and corrective action if necessary. This AD requires new repetitive inspections of the forward fitting lower radius of a certain frame for cracking, and corrective actions if necessary.

This AD was prompted by a determination that repetitive inspections and applicable corrective actions are necessary.

DATES: This AD is effective September 24, 2018.

COST: The FAA estimates that  this AD affects 94 airplanes of U.S. registry.

  • The actions required by AD 2017-15-17, and retained in this AD, take about 4 work-hours per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2017-15-17 is $340 per product.
  • The FAA also estimates that it takes about 4 work-hours per product to comply with the new requirements of this AD, including 1 work-hour per product for reporting. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of this AD on U.S. operators to be $425 per product.
  • The agency has received no definitive data that enables it to provide cost estimates for the on-condition actions specified in this AD.
FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC