Rough Waters Postpone Sea Launch's Thuraya-3 Launch Campaign | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Nov 28, 2007

Rough Waters Postpone Sea Launch's Thuraya-3 Launch Campaign

Platform Unable To Remain On Station Due To Currents, Winds

Due to unusually strong ocean currents at the launch site, Sea Launch is rescheduling the launch campaign for the Thuraya-3 communications satellite. The team is establishing an extended schedule for the Thuraya-3 mission, as the vessels return to Sea Launch Home Port. All personnel are doing well and all systems and the spacecraft are secure.

The Sea Launch team arrived at the launch site on November 10, and initiated a 72-hour countdown for a November 14 launch. Since that time, the Launch Platform has been subject to ocean currents of up to twice the normal levels, coupled with high winds. The result has been an inability for the vessel to maintain its launch position within established launch commit criteria.

The launch team put the countdown on hold several times in an effort to work around the challenging environmental conditions, and to find alternative positions and headings for the vessels. However, sea-state conditions continued to deteriorate further.

Sea Launch stressed its recently-refurbished Odyssey Launch Platform performed as expected in all operational aspects. Throughout operations at the launch site, all segments of the satellite and launch system remained nominal in launch readiness and are now being secured for transit to Home Port, according to procedure.

"Notwithstanding the ingenuity and positive attitude of every person in every segment on this mission and the absolute readiness of all systems to support the launch of Thuraya-3, Mother Nature is not cooperating," said Rob Peckham, president and general manager of Sea Launch. "Therefore, the integrated team (Marine Segment, Mission Director, Rocket Segment and Spacecraft) has agreed to terminate the countdown. We will now focus on extending the campaign and scheduling the corresponding activities required to return to the launch site and launch our customer's satellite."

Headquartered in Long Beach, CA, Sea Launch Company, LLC offers customers the most direct and cost-effective route to geostationary orbit for commercial communications satellites. With the advantage of a launch site on the Equator, the robust Zenit-3SL rocket can lift a heavier mass or provide longer life on orbit.

FMI: www.sea-launch.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC