Rough Waters Postpone Sea Launch's Thuraya-3 Launch Campaign | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Nov 28, 2007

Rough Waters Postpone Sea Launch's Thuraya-3 Launch Campaign

Platform Unable To Remain On Station Due To Currents, Winds

Due to unusually strong ocean currents at the launch site, Sea Launch is rescheduling the launch campaign for the Thuraya-3 communications satellite. The team is establishing an extended schedule for the Thuraya-3 mission, as the vessels return to Sea Launch Home Port. All personnel are doing well and all systems and the spacecraft are secure.

The Sea Launch team arrived at the launch site on November 10, and initiated a 72-hour countdown for a November 14 launch. Since that time, the Launch Platform has been subject to ocean currents of up to twice the normal levels, coupled with high winds. The result has been an inability for the vessel to maintain its launch position within established launch commit criteria.

The launch team put the countdown on hold several times in an effort to work around the challenging environmental conditions, and to find alternative positions and headings for the vessels. However, sea-state conditions continued to deteriorate further.

Sea Launch stressed its recently-refurbished Odyssey Launch Platform performed as expected in all operational aspects. Throughout operations at the launch site, all segments of the satellite and launch system remained nominal in launch readiness and are now being secured for transit to Home Port, according to procedure.

"Notwithstanding the ingenuity and positive attitude of every person in every segment on this mission and the absolute readiness of all systems to support the launch of Thuraya-3, Mother Nature is not cooperating," said Rob Peckham, president and general manager of Sea Launch. "Therefore, the integrated team (Marine Segment, Mission Director, Rocket Segment and Spacecraft) has agreed to terminate the countdown. We will now focus on extending the campaign and scheduling the corresponding activities required to return to the launch site and launch our customer's satellite."

Headquartered in Long Beach, CA, Sea Launch Company, LLC offers customers the most direct and cost-effective route to geostationary orbit for commercial communications satellites. With the advantage of a launch site on the Equator, the robust Zenit-3SL rocket can lift a heavier mass or provide longer life on orbit.

FMI: www.sea-launch.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC