The ERJ 135 Is Certified for Steep Approach Operations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Oct 10, 2003

The ERJ 135 Is Certified for Steep Approach Operations

Both CTA and JAA Issue Cert for Steep Approach Landing Operations

Embraer announced that its ERJ 135 aircraft was granted steep approach certification issued by both Brazilian and European regulatory authorities, respectively CTA (Centro Tecnico Aeroespacial) and JAA (Joint Aviation Authorities).

With such certification, the ERJ 135 becomes the first Embraer jet authorized to operate at London City (LCY) airport, located in downtown London, England. London City is a favorite airport for business passengers, as it is located very close to the city's financial center.

"The possibility of operating at London City adds an important competitive edge to the ERJ 135 in the European market," said Frederico Fleury Curado, Embraer's Executive Vice-President, Civil Aircraft. "Now Embraer jets become an option for European airlines that currently fly turboprops in and out of London City".

Instrument landing approach procedure is deemed as steep when the glide slope is greater than or equals 4.5 degrees in relation to horizon. While the standard instrument landing glide slope angle is 3.0 degrees, at LCY the glide angle is as great as 5.5 degrees. Normally the steep approach instrument landing procedure is used over great urban centers such as London to reduce noise, or in areas surrounded by mountains such as Lugano, Switzerland.

The ERJ 135 test campaign to obtain steep approach certification started in April 2003, and included development and certification flights in which CTA and JAA representatives took part, at Sao Jose dos Campos (Brazil), Blyte (USA) and Conventry (England). The campaign was completed after confirmation flights were made at London City airport during the month of September.

EMBRAER 170 On Track for Certification

The EMBRAER 170 certification campaign continues at full steam, following the company's definition of November 2003 as the certification date for the model.

The EMBRAER 170 is designed to operate from airports such as LCY, and is scheduled to start the steep approach certification campaign right after completing basic certification in November. The first customer that opted for this capability is SWISS, which is scheduled to take delivery of its first aircraft in August, 2004.

The EMBRAER 175 successfully performed its maiden flight on June 14th, and its certification is due in the 2nd Quarter 2004. The EMBRAER 190 certification program is scheduled for the 3rd Quarter 2005, followed by the EMBRAER 195 certification in the 2nd Quarter 2006. As of June 30, 2003, the EMBRAER 170/190 family has 244 firm orders and 309 purchase options from SWISS, Air Caraibes, Alitalia, GECAS, LOT, US Airways and JetBlue.

FMI: www.embraer.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC