Oregon's La Grande Airtanker Base Closed To All Operations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Sep 28, 2011

Oregon's La Grande Airtanker Base Closed To All Operations

Had Re-Opened Temporarily During Fire Season

The La Grande Airtanker Base (LGATB) at the Union County, OR, airport has once again been officially closed to all airtanker operations. Permanent repairs began on September 24 to the apron leading to the concrete retardant loading pads.

File Photo

It was determined in April 2011 that the asphalt apron had deteriorated to the point that it was no longer serviceable or safe to operate aircraft. At that time, the forest service said the airport’s runway was usable, but the adjacent apron where retardant or water is loaded onto firefighting planes needed to be rebuilt.
 
Inspections of the ramp area showed the asphalt pavement continuing to deteriorate. Inspectors found eight-inch cracks, sagging areas, and loose asphalt throughout the apron. The newer portion of the apron was also showing an increase in the number of cracks. A report indicated there was a high probability of subsurface failure, which could result in a serious accident or injury during air tanker base operations.

Temporary repairs to the apron extended the ability to operate the airtanker base during the 2011 fire season. Union County, OR, completed the temporary asphalt pavement repairs to the LGATB apron in late July 2011. The county’s Consulting Engineer for aviation operations validated that the repairs were adequate to allow operations for the remainder of the season. The Engineer also recommended daily inspections in order to ensure the apron’s continued serviceability.

The base is now closed to all operations until the permanent repairs are completed. The project is expected to cost $1.7 million and is scheduled for completion on June 1, 2012.

FMI: www.fs.fed.us

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC