Elements For The First A350 XWB Horizontal Tail Begin To Take Shape | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, Aug 02, 2011

Elements For The First A350 XWB Horizontal Tail Begin To Take Shape

Finished Elements Will Be Shipped To Toulouse, France For Final Assembly

Production on a key component in the A350 XWB’s initial horizontal tail plane has begun, marking a new industrial milestone for Airbus’ new-generation widebody jetliner family. This activity is being performed at Airbus’ centre of excellence in Puerto Real, Spain, and involves build-up of the horizontal tail plane’s lateral box in a combined effort with primary partner company Aernova.

Measuring some 30 feet long and from 4.5 and about 13 feet wide, the A350 XWB horizontal tail plane’s lateral box is composed primarily of carbon fibre – with its few metal components made of titanium alloys and aluminium.

After assembly is complete, the lateral boxes will be sent to Airbus’ facility in Getafe, Spain – where production of additional A350 XWB components is underway – for joining with the elevators and completion of the horizontal tail plane. The finished element then is to be transferred to the jetliner’s final assembly line in Toulouse, France. 

Airbus’ Puerto Real facility is used for the automated assembly of movable surfaces, final equipment processes and delivery of large structural components to the final assembly line in Toulouse. Its own assembly capabilities consist of a mobile line spread across five interlinked stations: main structure and trailing edge assembly; structural assembly of lateral boxes; automated drilling and riveting; trailing edge equipment; and final operations.

FMI: www.airbus.com

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC