Elements For The First A350 XWB Horizontal Tail Begin To Take Shape | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Aug 02, 2011

Elements For The First A350 XWB Horizontal Tail Begin To Take Shape

Finished Elements Will Be Shipped To Toulouse, France For Final Assembly

Production on a key component in the A350 XWB’s initial horizontal tail plane has begun, marking a new industrial milestone for Airbus’ new-generation widebody jetliner family. This activity is being performed at Airbus’ centre of excellence in Puerto Real, Spain, and involves build-up of the horizontal tail plane’s lateral box in a combined effort with primary partner company Aernova.

Measuring some 30 feet long and from 4.5 and about 13 feet wide, the A350 XWB horizontal tail plane’s lateral box is composed primarily of carbon fibre – with its few metal components made of titanium alloys and aluminium.

After assembly is complete, the lateral boxes will be sent to Airbus’ facility in Getafe, Spain – where production of additional A350 XWB components is underway – for joining with the elevators and completion of the horizontal tail plane. The finished element then is to be transferred to the jetliner’s final assembly line in Toulouse, France. 

Airbus’ Puerto Real facility is used for the automated assembly of movable surfaces, final equipment processes and delivery of large structural components to the final assembly line in Toulouse. Its own assembly capabilities consist of a mobile line spread across five interlinked stations: main structure and trailing edge assembly; structural assembly of lateral boxes; automated drilling and riveting; trailing edge equipment; and final operations.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC