L3 Achieves On-Time Delivery Of First USAF KC-10 CLS Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, May 15, 2017

L3 Achieves On-Time Delivery Of First USAF KC-10 CLS Aircraft

Work Completed In Under Six Months

L3 Technologies has delivered the first KC-10 aircraft under the U.S. Air Force’s (USAF) contractor logistics support (CLS) contract.

The on-time delivery is a significant milestone for the USAF KC-10 CLS program. L3’s Vertex Aerospace division received the aircraft in January 2017 and, in collaboration with subcontractor and primary depot provider HAECO/TIMCO of Greensboro, North Carolina, completed a heavy maintenance check, known as a C-check, in under six months.

“This is an important achievement that demonstrates our expertise and scope of services on the CLS program,” said Michael T. Strianese, L3’s Chairman and Chief Executive Officer. “The Air Force is a longtime valued customer and we continue to work closely with them as a trusted partner to ensure ongoing KC-10 mission effectiveness.”

Under the current contract, L3 provides Contractor Operated and Maintained Base Supply (COMBS), Field Service Representative (FSR) and depot maintenance support for 59 USAF KC-10 aircraft, as well as COMBS and FSR support for the Aerial Refueling System for two Royal Netherlands Air Force KDC-10 aircraft. L3 provides all support for the program, including labor, materials, tools, equipment, parts and transportation.

“Over the past 30 years, L3 Vertex Aerospace is the only company to achieve on-time delivery of its first aircraft to undergo a C-check during the program transition,” said Mark Von Schwarz, President of L3’s Aerospace Systems business segment, which includes Vertex Aerospace. “We are proud to provide proven solutions that advance the Air Force’s mission around the world.”

While the most recent USAF KC-10 CLS contract was awarded in 2016, Vertex Aerospace also provided logistics support for the KC-10 fleet from 1993 through 1998.

(Image provided with L-3 news release)

FMI: www.L3T.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC