Endeavour To Move To Launch Pad Next Week | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sat, Sep 13, 2008

Endeavour To Move To Launch Pad Next Week

In Place For Atlantis Rescue Mission If Necessary

NASA tells ANN the space shuttle Endeavour is scheduled to roll out to Launch Pad 39B at NASA's Kennedy Space Center on Thursday, September 18, in preparation for shuttle Atlantis' mission to repair the Hubble Space Telescope. Endeavour will stand by in the unlikely event a rescue mission is necessary following Atlantis' launch, which is targeted for October 10.

After Endeavour is cleared from its duty as a rescue vehicle, it will move to Launch Pad 39A for its primary STS-126 mission to the International Space Station. That flight is targeted for launch November 12.

On Thursday, Endeavour rolled over from Kennedy's Orbiter Processing Facility to the Vehicle Assembly Building. There, Endeavour will be attached to its external fuel tank and twin solid rocket boosters to prepare for its move to the pad.

The first motion of the shuttle toward the launch pad September 18 is scheduled for 12:01 am EDT. The fully assembled space shuttle -- consisting of the orbiter, external tank and twin solid rocket boosters -- will be delivered to the pad atop a crawler-transporter.

The crawler will travel slower than 1 mph during the 4.2-mile journey. The process is expected to take approximately seven hours.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC