NASA KLASS Enables Students To Launch Virtual Space Shuttle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, May 12, 2010

NASA KLASS Enables Students To Launch Virtual Space Shuttle

Allows Elementary School Kids To Learn About Critical "Go, No Go" Decisions

As NASA prepares for one of its final three space shuttle launches on Friday, May 14, the agency is offering the ABCs of 3,2,1 liftoff to students and educators throughout the nation. A new computer simulation program will allow them to take on the roles of NASA engineers and launch the shuttle from their own classrooms.

The program is based on software used for training at the shuttle Launch Control Center at NASA's Kennedy Space Center in Florida. The Kennedy Launch Academy Simulation System, or KLASS, gives students the chance to monitor important shuttle systems during a launch countdown and decide whether they are "go" for liftoff. They will work together as a team and learn about the different responsibilities behind-the-scenes of a shuttle launch.

KLASS was designed for sixth- through 10th-grade students to develop their science, technology, engineering and math skills.

In addition to the launch simulation software, KLASS is offering 40 hours of lesson plans and interactive resources for teachers. These materials can be used for one-day lessons or one-year curriculums.

FMI: www.nasa.gov/education/klass

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC