AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, May 14, 2019

AD: The Boeing Company Airplanes

AD NUMBER: 2019-08-02

PRODUCT: Certain Boeing Model 737-100, -200, -200C, -300, -400, and -500 series airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by reports of cracking in the frame web, frame integral inboard chord, and fail-safe chord on multiple airplanes in multiple locations between stringers S-10 and S-17 above the passenger floor, in addition to an evaluation by the design approval holder (DAH) indicating that certain fuselage frame splices are subject to widespread fatigue damage (WFD).

This AD requires repetitive inspections of certain fuselage upper frames, side frames, fail-safe chords, inboard chords, frame webs, and stringers; an inspection for open tooling holes and the presence of repairs in certain inspection zones; and applicable on-condition actions.

DATES: This AD is effective June 13, 2019.

COST: The FAA estimates that this AD affects 262 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Inspections: Up to 243 work-hours × $85 per hour = $20,655 per inspection cycle.

The FAA has received no definitive data that would enable it to provide cost estimates for the oncondition actions specified in this AD.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC