Navy Awards Contract For Operational Test CH-53K Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Jun 08, 2013

Navy Awards Contract For Operational Test CH-53K Aircraft

Operational Evaluation For The Helicopters To Be Conducted By The USMC

The Naval Air Systems Command (NAVAIR) has awarded a $435 million cost-plus-incentive contract to Sikorsky to build four production-representative CH-53K heavy lift helicopters for the U.S. Marine Corps on May 30. These four aircraft will be the System Demonstration Test Articles (SDTA) that the Marines will test during operational evaluation.

“The SDTA contract represents an exciting and significant milestone in our program,” said Col. Robert Pridgen, the Heavy Lift Helicopters program manager for NAVAIR. “We are well on our way to making the CH-53K a reality for our Marines and our naval fleet. The capability this aircraft brings, in every clime and place, is critical to sustaining the future missions of the Marine Air/Ground Task Force. The future of heavy lift is bright.”
 
“The four SDTA aircraft are based on the configuration of the fourth and final flight test aircraft currently being assembled on the prototype production line,” said Dr. Michael Torok, Sikorsky’s CH-53K Program Vice President. “We truly appreciate the high level of confidence the Navy and Marine Corps have shown to the CH-53K team as we move forward with this important next phase of the program.”
 
The Navy has included the SDTA helicopters as an additional contract line item under the existing $3.5 billion System Development and Demonstration (SDD) contract initially awarded to Sikorsky in April 2006. The contract schedule requires Sikorsky to deliver the first SDTA aircraft in 39 months, and the fourth by the end of March 2017, when the Marines will begin operational evaluation. The contract’s fee arrangement incentivizes Sikorsky to deliver early. Sikorsky will perform final assembly of the SDTA aircraft at the company’s Florida Assembly and Flight Operations facility in West Palm Beach.
 
To date, Sikorsky has delivered two of the seven SDD CH-53K aircraft – the Ground Test Vehicle and the Static Test Article – into the test program, and is finalizing assembly of the four flight test aircraft and the Fatigue Test Article. First flight of a CH-53K prototype aircraft is expected in late 2014.

(Images provided by NAVAIR)

FMI: www.navair.navy.mil


Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC