Final Assembly Begins on Fifth Boeing 787 Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, May 02, 2008

Final Assembly Begins on Fifth Boeing 787 Dreamliner

Third Flight-Test Airplane Loaded into First Position

They're not flying 'em yet... but Boeing is making progress with building 'em. Final assembly began this week on the third flight-test Boeing 787 Dreamliner, the first plane that will sport a finished interior.

As ANN reported, Boeing announced a third delay to the 787 program last month, due to continued problems with components received from suppliers, unanticipated rework, and the addition of a margin into the testing schedule. First flight of the composite-bodied airplane moved to the fourth quarter of 2008, rather than the end of the second quarter, and first delivery is now planned for the third quarter of 2009 instead of first quarter.

While the planemaker continues to work towards putting a Dreamliner in the air, Boeing notes this is the fifth Dreamliner to be loaded into the first position of the 787 production system. The static test airframe moved April 25 from the Final Assembly to its test rig in another bay of the Everett, WA-based factory.

Both the fatigue test airframe and the second flight-test airplane have advanced to the next position in production, where assembly and systems installation work continues... further signs that early supplier issues and production snags are, ever-so-slowly, being ironed out.

"We are receiving assemblies that are much more complete," said Jack Jones, vice president of 787 Final Assembly and Change Incorporation. Jones replaces Steve Westby, who retired from Boeing yesterday after a 31-year career. "The second flight-test airplane had a 50 percent reduction in the amount of incomplete work as compared to the first airplane. 'Traveled work' on this airplane is 65 percent less than on the first."

After assembly is complete, this airplane will be fitted with an interior as part of the comprehensive flight-test program and certification process.

"When that happens this summer, it will be the first time we'll see the 787 in what is close to a final delivery configuration," Jones said.

The first airplane to fly is on track for "power on" in June.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC