ND TFR: 06.14.07 - 06.17.07 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jun 07, 2007

ND TFR: 06.14.07 - 06.17.07

NOTAM Number: FDC 7/3518 
Issue Date: June 07, 2007 at 1307 UTC 
Location: Hector International Airport, Fargo, North Dakota near FARGO VORTAC (FAR)  Beginning Date and Time: June 14, 2007 at 1500 UTC 
Ending Date and Time: June 17, 2007 at 2200 UTC 
Reason for NOTAM: The Fargo Air Show 
Type: Airshow 
Replaced NOTAM(s): N/A 
Pilots May Contact: Fargo (FAR) Air Traffic Control Tower, 701-235-8894 

Affected Area(s) 

Airspace Definition: 
  Center: 9.4 nautical miles from FARGO VORTAC(FAR) on the 000 radial (Latitude: 46º54'30"N, Longitude: 96º48'59"W)
 Radius: 5 nautical miles
 Altitude: From the surface up to and including 16000 feet MSL
Effective Date(s):
 From June 14, 2007 at 1500 UTC
 To June 14, 2007 at 2200 UTC
 From June 15, 2007 at 1700 UTC
 To June 15, 2007 at 2200 UTC
 From June 16, 2007 at 1600 UTC
 To June 16, 2007 at 2200 UTC
 From June 17, 2007 at 1600 UTC
 To June 17, 2007 at 2200 UTC

Operating Restrictions and Requirements

No pilots may operate an aircraft in the areas covered by this NOTAM (except as described).

Unless authorized by ATC.

Other Information:

ARTCC: ZMP - Minneapolis Center
Point of Contact: Mark Ringham
 Telephone 701-866-9078
Authority: Title 14 CFR section 91.145

FMI: www.tfr.faa.gov, Depicted TFR data may not be a complete listing. Pilots should not use the information on this website for flight planning purposes. For the latest information, call your local Flight Service Station at 1-800-WX-BRIEF.

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC