Aero-TV: Slow and Steady -- Updated Eclipse Program Maintains Course | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Oct 14, 2010

Aero-TV: Slow and Steady -- Updated Eclipse Program Maintains Course

Embattled VLJ Keeps Up With Promising Comeback

With the 2010 rendition of NBAA's annual convention literally days away, a recent trip to KABQ necessitated a run over to Eclipse to see what they might have in store for this year's event in Atlanta, GA.

We covered a number of topics... though Eclipse Honcho Mason Holland refused to divulge any of the announcements planned for Atlanta... but did offer up a status report on all things Eclipse and Total Eclipse.

Recently, ANN reported on the completion of an enhanced windshield application for the dissipation of precipitation static on windshields, and aircraft design changes for operation up to 41,000 feet -- in accordance with promises they made to Eclipse aircraft owners after EAI acquired the assets of the previous company.

The new FAA certified windshield application uses a thin carbon strip that is adhered directly to existing Eclipse twin-engine jet windshields. This maintenance-free strip is bonded across the windshield and to the aircraft structure creating a conductive path, which acts as a diverter to dissipate potential precipitation static under certain flight conditions.

In addition to the improved windshield application, EAI also announces the successful completion of the engineering requirements addressing the existing FAA Airworthiness Directive, restricting flight to 37,000 feet. Eclipse is actively testing these modifications and has completed the final design.

Final certification of the aircraft modifications are expected prior to the end of the year. After installation in the aircraft, these modifications will permit the EA500 to return to a service ceiling of 41,000 feet.

Mason also noted that the Total Eclipse refurbishment programs seems to be holding its own despite the vagaries of a tough economy and our inspection of a recent TE completion showed off some pretty nice work... especially on the interior. So far... so good!

FMI: www.eclipseaerospace.com, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC