Final Assembly Underway On First GE9X Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Feb 11, 2016

Final Assembly Underway On First GE9X Engine

Will Enter Service In Four Years Aboard Boeing's 777X

Final assembly is well underway on the first full GE9X engine that will test in the first half of 2016, four years before the GE9X engine enters service on a Boeing 777X aircraft.

“Assembly of the first full GE9X engine is on track and coming together very nicely,” said Bill Millhaem, general manager of the GE90/GE9X engine programs at GE Aviation. “The GE9X team is extremely excited to see the engine design come to life and looks forward to watching it run soon on a test stand in Peebles, Ohio.“

The first engine to test (FETT) wraps up the extensive technology maturation program for the GE9X engine program, which began almost five years ago and has included component-level, system-level and core demo testing to validate the advanced technologies and materials in the new engine. FETT brings all the technologies together to demonstrate their operability as a complete propulsion system as well as provide early information on the engine’s aerodynamic and thermal characteristics.

Compared to prior engine development programs, the GE9X FETT is scheduled earlier in the development process, just a mere six months after the engine design was finalized. The second GE9X engine is scheduled to test in 2017 along with flight testing on GE Aviation’s flying test bed. This timing assures all learnings from FETT will be captured in all certification engines. Engine certification is anticipated in 2018.

With almost 700 GE9X engines on order, the GE9X engine will be in the 100,000 pound thrust class and will be the largest engine ever produced with a 134-inch diameter composite fan case and 16 fourth generation carbon fiber composite fan blades. Other key features include; a next-generation 27:1 pressure-ratio 11-stage high-pressure compressor; a third-generation TAPS III combustor for high efficiency and low emissions; and CMC material in the combustor and turbine.

IHI Corporation, Snecma and Techspace Aero (Safran), and MTU Aero Engines AG are participants in the GE9X engine program.

(Source: GE Aviation news release)

FMI: www.geaviation.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC