DOD Details VXX Work Split Locations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Jan 30, 2005

DOD Details VXX Work Split Locations

Over A Third Of The Work To Be Performed Outside The United States

The Department of Defense has issued a statement detailing the amount of work that will be performed on the Lockheed-Martin VXX presidential helicopter replacement, by city, state and country.

The Systems Development and Demonstration phase of the contract, which ANN previously reported totalled just under $1.8 billion, consists of engineering design and integration work for the myriad communications, navigation and mission systems required to perform the support mission for the President of the United States.

The phase also includes a comprehensive test and evaluation program, and production of five aircraft to introduce the operational capability. The locations where the SDD work will be performed, and the percentage of work assigned to each, are:

  • Owego (NY), 31 percent
  • Amarillo (TX), 27 percent
  • Yeovil, United Kingdom, 21 percent
  • Agusta, Cascina Costa, Italy, 15 percent
  • Lynn (MA), 3 percent
  • Rancho Santa Margarita (CA), 1 percent
  • Grand Rapids (MI), 1 percent
  • Denton (TX), 1 percent

The SDD phase is expected to be completed by September 2011, and the contract funds for the program will not expire at the end of this fiscal year. The contracting activity for this program is the Naval Air Systems Command, Patuxent River (MD).

FMI: www.dod.gov

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC