F-35C Completes Developmental Test Phase 2 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Feb 08, 2016

F-35C Completes Developmental Test Phase 2

Included 66 Catapult Launches And Traps Aboard CVN-69

The F-35C Carrier Suitability Test Team deployed aboard the USS Dwight D. Eisenhower (CVN-69) for Developmental Test Phase Two (DT-II) in October 2015. Trials with F-35C test aircraft CF-3 and CF-5 spanned nine days in operating areas near the Atlantic coast between Florida and Virginia. DT-II followed a successful round of initial sea trials in 2014.

The team completed sixty-six catapults and traps to expand the gross weight and crosswind operating limits established on USS Nimitz (CVN-68) during DT-I. These tests included catapult launches up to the maximum aircraft gross weight with full internal stores as well as the expanding crosswind limits for launch and recovery. This testing supported the official US Navy aircraft launch and recovery bulletin that is required for fleet F-35C pilots to conduct carrier qualifications in 2016.

Additional testing completed on board the Ike included a variety of Logistics Test and Evaluation, or LT&E, tasks required to prove the F-35C can be maintained and supported above and below deck in the shipboard environment of a Nimitz class carrier. This testing included an engine run and Integrated Power Pack, or IPP, run in the hangar deck, deck spotting, chaining, weapons loading, as well as F135 engine compatibility testing in the ship’s engine shop.

Overall, the test team completed all required test objectives and finished ahead of schedule. . Only one sea trial deployment remains during F-35C development and those sea trials will complete all testing necessary for a full Block 3F fleet operation envelope with internal and external stores. DT-III is planned for the summer of 2016 when the test team again takes CF-03 and CF-05 back to sea for several weeks of testing. This final test phase will primarily focus on expanding the aircraft operating limits with a variety of symmetric and asymmetric external store configurations.

(Image provided with Lockheed Martin news release)

FMI: www.navy.mil, www.lockheedmartin.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC