NASA Awards Development Contract For Ares I Roll Control Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, May 17, 2007

NASA Awards Development Contract For Ares I Roll Control Engines

First Stage Motors Will Keep Rocket Stable After Launch

The pieces of the complex development puzzle for NASA's next-generation space travel system are coming together. This week, NASA selected Aerojet-General Corp. of Redmond, WA to provide developmental engines for the Ares I crew launch vehicle first stage roll control system.

These engines are the first in a series of steps to develop the roll control system to manage the amount of rotation by the first stage solid rocket from liftoff to its separation from the second stage, ensuring that Ares I stays on the designated trajectory for the first two minutes of flight. The engines being developed by Aerojet under this contract will be used to mature the roll control system that will be used on the Ares I tests program.

The Ares I crew launch vehicle will transport the Orion crew exploration vehicle, its crew or other small cargo payloads to low-Earth orbit. The first stage will consist of a single solid rocket booster similar to those used on the space shuttle, but with a fifth motor segment added.

An upper stage consisting of a J-2X liquid hydrogen, liquid oxygen engine and the associated propellant tanks and fuel distribution systems will complete the trip to orbit.

The cost-plus-fixed-fee competitively-awared contract has an 11-month period of performance with a potential total value of $8.1 million, if the additional 11- month contract option for engine fabrication and testing is exercised.

The Ares I project is managed by NASA's Marshall Space Flight Center in Huntsville, AL for NAA's Constellation Program.

FMI: www.nasa.gov/constellation, www.aerojet.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC