AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Sep 20, 2020

AD: General Electric Company Turbofan Engines

AD 2020-18-14 Prompted By A Report From The Manufacturer That A Subsurface Anomaly Was Found

The FAA is adopting a new airworthiness directive (AD) for all General Electric Company (GE) GE90-110B1 and GE90-115B model turbofan engines with a certain high-pressure turbine (HPT) rotor stage 2 disk installed.

This AD was prompted by a report from the manufacturer that a subsurface anomaly was found on a HPT rotor stage 2 disk. This AD requires an ultrasonic inspection (USI) of the HPT rotor stage 2 disk and, depending on the result of the inspection, replacement of the HPT rotor stage 2 disk with a part eligible for installation. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective October 21, 2020.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to all GE GE90-110B1 and GE90-115B model turbofan engines with a certain HPT rotor stage 2 disk installed. The NPRM published in the Federal Register on May 18, 2020 (85 FR 29676). The NPRM was prompted by a report from the manufacturer that a subsurface anomaly was found on a HPT rotor stage 2 disk. The NPRM proposed to require a USI of the HPT rotor stage 2 disk and, depending on the result of the inspection, replacement of the HPT rotor stage 2 disk with a part eligible for installation. The FAA is issuing this AD to address the unsafe condition on these products.

FMI: www.regulations.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC