FAA To Propose AD Monday To Address GE Engine Shutdowns | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Nov 12, 2011

FAA To Propose AD Monday To Address GE Engine Shutdowns

New AD Would Supersede 2007 Directive For Popular Widebody Engine

The FAA is set to supersede an existing airworthiness directive (AD) that applies to all GE CF6-80C2B series turbofan engines. The existing AD currently requires installing software version 8.2.Q1 to the engine electronic control unit (ECU), which increases the engine's margin to flameout. Since that AD was issued, the FAA has received reports of additional engine events.

The proposed AD, expected to be published Monday, would require the removal of the affected ECUs from service. The AD is being proposed to prevent engine flameout or un-commanded engine in-flight shutdown (IFSD) of one or more engines, leading to an emergency or forced landing of the airplane.

On May 30, 2007, AD 2007-12-07, Amendment 39-15085 was issued, for all GE CF6-80C2B series turbofan engines. Since that AD was issued, the FAA has received two reports of ice crystal condition flameouts on engines equipped with the upgraded ECU software. Prompted by these reports, GE developed ECU software version 8.2.R with improved inclement weather capability, and enhanced fuel metering valve (FMV) fault handling logic to reduce the risk of engine IFSD caused by intermittent FMV feedback signals.

Subsequently, the FAA received reports of eight engine IFSD events and four engine flameout ground events. These events were caused by ignition system induced noise creating dual-channel faults in the CPU. The event engines were operating with 8.2.Q1 and 8.2.R versions of ECU software and equipped with the new generation of front panel assembly (FPA) and pressure subsystem (PSS) circuit boards. Prompted by these reports, GE developed an ECU hardware fix to eliminate the potential for dual-channel CPU faults due to ignition system-induced noise. The proposed AD removes the affected ECUs from the fleet.

The FAA estimates that the total cost of the AD to U.S. operators to be $3.4 million. The AD would be open for comments until January 13, 2012.

FMI: Federal Register

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC