Navy To Stick With Development Of Electromagnetic Launch System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Apr 17, 2009

Navy To Stick With Development Of Electromagnetic Launch System

Would Replace Steam Catapults On Aircraft Carriers

Thanks for the recommendation... but we're going to do it anyway. That's the message the US Navy had for the Government Accountability Office this week, in proceeding with development of a new launching system for carrier-based aircraft.

Reuters reports the Navy opted to allow General Atomics to continue work on its electromagnetic aircraft launching system (EMALS), slated for installation onboard the USS Gerald R. Ford (CVN 78). That new aircraft carrier, built by Northrop Grumman, is slated to enter service in 2015.

Navy spokesman Lieutenant Commander Victor Chen said EMALS "promises to lower overall lifecycle costs, require less maintenance than steam catapults and generate less physical stress on carrier-based aircraft." However, a recent GAO review of the program identified several concerns, including cost-overrun risks and technical problems.

Specifically, the GAO said the Navy may not know whether EMALS works as promised... until at least seven months after the first components of the system are installed onboard the Gerald R. Ford. By that time, it would be too late to install a steam-based catapult system, at least not without significant redesigns and delays.

The GAO termed EMALS one of the highest risk factors in keeping work on the new carrier on schedule.

FMI: www.navy.mil, www.gao.gov, www.northropgrumman.com, www.ga.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC