AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Jan 30, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-02-12

PRODUCT: Certain Airbus Model A320-211, -212, and -231 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-02-01, which applied to the products listed above.

AD 2016-02-01 required repetitive inspections to detect cracks of the pressurized floor fittings at a certain frame, and renewal of the zone protective finish or replacement of fittings with new fittings if necessary. AD 2016-02-01 also provided an optional modification that was terminating action for the repetitive inspections.

This new AD retains the requirements of AD 2016-02-01, and requires accomplishment of the modification that was optional in AD 2016-02-01.

This AD was prompted by the results of an additional fatigue analysis of cracking of the pressurized floor fittings and a determination that the optional modification should become a required action.  

DATES: This AD is effective March 2, 2018.

COST: The FAA estimates that this AD affects 13 airplanes of U.S. registry. The following costs are estimated for compliance:

  • Inspection: 11 work-hours × $85 per hour = $935 per aircraft per inspection cycle.
  • Modification: 85 work-hours × $85 per hour = $7,225 Parts = $5,320. Cost per aircraft: $12,545
FMI: AD

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC