United, Houston Airport System Begin Redevelopment Project | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Jan 25, 2012

United, Houston Airport System Begin Redevelopment Project

Groundbreaking Starts Construction Of New Terminal B South Concourse At George Bush Intercontinental Airport

Houston Mayor Annise Parker (pictured) and the Houston Airport System, in partnership with United Continental Holdings broke ground Monday on the first phase of a three-phase redevelopment project at George Bush Intercontinental Airport. Phase one of the project, to be completed in 2013, will create a new Terminal B south concourse dedicated to regional jet operations.

The $160 million south concourse project will replace the existing south side flight stations with a new 225,000 square-foot facility to accommodate United's regional aircraft. At nearly four times the size of the existing space, the new concourse will provide a better customer experience, as it will feature modern and expanded gate lounge areas, concessions and restroom facilities.

Travelers will access the new concourse from the terminal via a 95-foot-wide bridge with 13,000 square feet of food, beverage and retail concessions – a 500-percent increase in concession space over the current facility. The concourse will feature 28-foot-high floor-to-ceiling glass windows, offering expansive tarmac views from spacious central passenger lounge areas with durable and modern interior finishes.

"As I noted in my inaugural address, creating jobs for Houstonians is my number-one job for the next two years," said Mayor Parker. "Phase one of this billion-dollar investment with United is the first delivery on that promise. We celebrate the boost to our local economy that will result from this investment. Houston will thrive as our global gateway expands to include more flights and greater access to business connections around the world."

Houston-Bush Intercontinental Airport

"Houston is our largest hub and a vital international gateway in United's network," said Pete McDonald, United's executive vice president and chief operations officer. "This investment in the Houston hub will allow us to accommodate more customers and more aircraft types, provide new amenities for travelers and improve efficiencies for the new United."

Plans for future phases of the $1 billion redevelopment project include redevelopment of the central Terminal B lobby and baggage claim areas, a new international-capable north concourse for mainline and regional jets, a new Terminal B Federal Inspections Services (FIS) facility and infrastructure improvements. The entire three-phase redevelopment project is planned over the next seven to 10 years, based on demand. The Houston Airport System is partnering with United on the project and the new construction will be a significant investment in the local economy by creating many jobs. "Bush Intercontinental is the first impression many people have of Houston," said Mario C. Diaz, director of the Houston Airport System. "We exist to connect people, businesses and economies around the world, and this project will allow for an enhanced customer experience."

FMI: www.fly2houston.com, www.unitedcontinentalholdings.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC