Transport Canada Approves Cycle Limit Increases For PT6A-140 Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Fri, Dec 07, 2018

Transport Canada Approves Cycle Limit Increases For PT6A-140 Engines

Boosted Up To 60 Percent For Certain Engine Components

Transport Canada has approved an increase to cycle limits on Pratt & Whitney Canada PT6A-140, -140A and -140AG engines.  These increases – made possible through comprehensive parts testing and model analyses – will extend the life of Low Cycle Fatigue (LCF) parts such as the power and compressor turbine disks and the impeller.

"We are committed to exploring and developing innovative solutions that keep our customers flying longer and at reduced operating and maintenance costs," said Nicholas Kanellias, Vice President, General Aviation at Pratt & Whitney Canada. "For the vast majority of PT6A-140 series operators, these extensions will push the requirement to replace LCF parts further into the future."

An engine cycle is counted every time an engine is started, flown and then shutdown. An abbreviated cycle is counted when an engine remains running between flights. The cycle limits for the PT6A-140-series engines have now been increased by up to 60 percent for the following parts: from 12,000 cycles to 16,000 cycles for the power turbine disk, from 10,000 cycles to 16,000 cycles for the compressor turbine disk and from 19,000 cycles to 29,000 cycles for the impeller. Also as it pertains to the power turbine disk, the number of abbreviated cycles needed to count as a full cycle has increased from two to five.

"These numbers tell a compelling story for the maintenance costs of the PT6A-140 engine series," says Kanellias. "For PT6A-140-series operators who start their engines often, these changes mean our customers will have ample time on wing to reach their second overhaul at 8,000 hours. Operators performing fewer engine starts will see their cycle impacts extended beyond the third overhaul at 12,000 hours. So while operators must always count their engine cycles, the associated maintenance – and related cost – are reduced.

"The cycle limits on the PT6A engine do not dictate the timing of an overhaul, only the need to replace a specific part," explains Kanellias. "So today's initiative increases operator value by taking an engine with enhanced attributes and elevating it to yet another level of performance and durability. It's another reason that operators who want unmatched performance and reliability see the PT6A family as the engine of choice."

Pratt & Whitney customers can benefit from flexible and tailored solutions focused on driving greater availability and lowering maintenance costs. Solutions such as FAST (Full-Flight, Acquisition, Storage and Transmission) and Oil Analysis Technology program provide proactive, predictive and preventive engine health management, which also enables customers to optimize their operations and reduce operation costs.

(Source: Pratt & Whitney Canada news release. Image from file)

FMI: www.pratt-whitney.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC