ATK Announces $178 Million Contract Award From United Launch Alliance | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sun, Apr 20, 2014

ATK Announces $178 Million Contract Award From United Launch Alliance

Will Build Composite Launch Vehicle Structures For Both Atlas V And Delta IV Programs

An agreement has been reached on a $178 million contract award as part of the Air Force's Phase 1 Evolved Expendable Launch Vehicle (EELV) buy from United Launch Alliance (ULA). The order value includes hardware for both of the current United States Air Force EELV launch vehicles, the Atlas V and Delta IV. The initial contracting period with ATK includes large composite structures with deliveries commencing in AFY14 and continuing into early AFY18. The option period includes hardware deliveries in AFY17 through AFY19.

"ATK's continued involvement in the Atlas V and Delta IV launch vehicles is a strong demonstration of our workforce's engineering and manufacturing abilities," said Joy de Lisser, vice president and general manager of ATK's Aerospace Structures division. "Our ongoing support of ULA missions is a critical element of our business, and we are proud to provide support for these successful programs."

The order consists of a variety of composite structures 13 to 18 feet in diameter with lengths up to 63 feet, including fairings, payload adapters and diaphragms, interstages, nose cones and structures providing main engine thermal/aerodynamic protection. All of the structures will be fabricated in ATK's Large Structures Center of Excellence (COE) in Iuka, MS, employing advanced fiber placement and hand lay-up processes, automated machining and ultrasonic inspection techniques.

The Large Structures COE boasts more than 320,000 square feet of manufacturing floor space, including 86,000 square feet of clean room facility, which houses some of the largest specialized processing equipment of its kind in the United States. 

FMI: www.atk.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC