NASA Rolls Atlantis Out To Pad | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, May 16, 2007

NASA Rolls Atlantis Out To Pad

Agency Targeting June 8 Launch

It's time to try again. After a three-month mission delay brought about by a February thunderstorm, space shuttle Atlantis is back out at its launch pad at NASA's Kennedy Space Center, in preparation for a planned June 8 launch. Teams are preparing Atlantis for its mission, STS-117, to the International Space Station.

NASA reports Atlantis rolled out of Kennedy's Vehicle Assembly Building at 5:02 am EDT Tuesday on a massive crawler transporter. Traveling less than 1 mph, the journey ended with Atlantis atop the launcher pedestals at Launch Pad 39-A at 11:47 am. Total trip time was six hours and 45 minutes.

Electrical and mechanical connections of Atlantis to the launch pad are under way. With the refurbishment of Pad 39-A, this launch will be the first from the pad in four years.

As ANN reported, Atlantis was originally targeted for launch in March... but a February 26 hailstorm damaged foam insulation on the shuttle's external fuel tank and forced managers to roll the spacecraft back into the Vehicle Assembly Building to make repairs.

Atlantis' payload, consisting of the S3/S4 truss, will be installed into the shuttle's payload bay on Wednesday. Beginning May 23, propellants will be loaded into Atlantis' storage tanks that will be used by the orbital maneuvering system and reaction control system to move the spacecraft while it's in orbit.

The flight readiness review meeting, where the official launch date is scheduled, will be held May 30-31 at Kennedy. For a launch on June 8 at 7:37 pm, the 43-hour countdown would begin on June 5.

STS-117 Commander Rick Sturckow, Pilot Lee Archambault and Mission Specialists Jim Reilly, Patrick Forrester, Steven Swanson, John "Danny" Olivas and Clay Anderson are scheduled to arrive at Kennedy on June 4.

During their 11-day mission, the astronauts will work with the space station crew and ground teams to install the girder-like S3/S4 truss segment, unfold a new set of solar arrays and retract one array on the starboard side of the station.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC