ATK Earns Contract Extension And Expansion On A350 XWB Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Oct 27, 2012

ATK Earns Contract Extension And Expansion On A350 XWB Program

Agreement Includes Potential For Up To 800 Additional Production Ship-Sets

ATK has entered into a contract extension through 2027 for its work providing lightweight composite fuselage stringers and frames for the Airbus A350 XWB program. In addition, ATK's contract includes increased scope for design changes and added manufacturing operations. This project expansion is a significant milestone for ATK and represents a continuation of the valuable working relationship ATK has developed with Airbus.

"We are very pleased to have reached this agreement with Airbus," said Joy de Lisser, vice president and general manager of ATK's Aerospace Structures Division. "This marks another big step in our long-term partnership with Airbus on the A350 XWB program. We are very proud of the trust and level of accomplishment that this extension represents."

The A350 XWB work is performed at ATK's Aircraft Commercial Center of Excellence (ACCE) facility in Clearfield, Utah. The extended work includes the potential of up to an additional 800 ship-sets of production, creating a long-term relationship between Airbus and ATK.
 
ATK's proprietary automated stiffener forming machines (ASFM) have been instrumental in the development and manufacture of composite stringers and frames. The Company's ASFM process enables ATK to produce extremely high quality, dimensionally precise and highly repeatable composite components for all stringers and frames needed in the fuselage, while reducing manufacturing time over traditional hand lay-up methods.

(Pictured: Artist's rendering of Airbus A350 XWB)

FMI: www.atk.com

 


Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC