NASA Appoints Board To Investigate Shuttle Arm Incident | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sat, Mar 18, 2006

NASA Appoints Board To Investigate Shuttle Arm Incident

NASA has formed a board at the agency's Kennedy Space Center, Fla., to investigate the March 4 incident that damaged Space Shuttle Discovery's remote manipulator system (shuttle arm).

Hugo Delgado is chairman of the five-member investigation board. He is deputy director for the Office of the Chief Engineer at Kennedy. The board is supported by one ex-officio member, four advisors and administrative personnel.

Board functions include investigating the facts surrounding the incident, determining its probable cause, assessing the possibility of a recurrence and recommending corrective actions.

A final report is expected this summer.

One Inch Dent

On March 4 at about 10:10 p.m. EST, shuttle technicians inside a bridge bucket work platform device accidentally bumped into Discovery's robotic arm. The arm is a 50-foot-long, jointed extension used to grapple payloads, remove them from the payload bay and move spacewalking astronauts to various work platforms.

Inspections showed two indentations in the arm's outer bumper layer, a Kevlar-covered plastic, honeycombed structure designed to protect the arm from minor impacts. One of the indentations in the honeycombed layer is oval shaped, 0.115 inch deep and 1 inch in diameter.

The second indentation, also oval shaped, is 0.035 inch deep and 0.5 inch in diameter. Ultrasound inspections were performed once the Kevlar and honeycombed layer were removed.

Under the largest indentation was a small crack in the carbon-fiber composite, measuring 1.25 inches long and 0.015 inches deep. The arm was removed from the vehicle on Tuesday and will be sent back to the vendor for repair.

The shuttle is in Kennedy's Orbiter Processing Facility bay 3. It is undergoing preparations for the STS-121 mission to the International Space Station. The launch is targeted for no earlier than July 1.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC