Please Hold Your Applause -- Airbus Says A380 Wiring Work Remains | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Jan 26, 2007

Please Hold Your Applause -- Airbus Says A380 Wiring Work Remains

Should Be Ironed Out By 26th Airframe

It appears word Airbus this week had solved a series of technical glitches with stubborn wiring harnesses on its A380 megajumbo may have been a tad optimistic... as the European planemaker said Thursday problems had been solved on the first aircraft only.

Reuters reports Gerhard Puttfarcken, head of Airbus' German operations, told a German newspaper this week Airbus had solved its wiring problems with the A380. Numerous news outlets, including ANN, quickly hailed the news as a long-awaited step in the righr direction for the beleagured planemaker.

Puttfarcken clarified his comments Thursday, however... stating Airbus had only solved the wiring problems on the aircraft scheduled for delivery to launch customer Singapore Airlines later this year, but work remains on other airframes.

That's good news for Singapore Airlines... but questions remain for subsequent airframes.

"We are creating the conditions so that in future there will be one common platform from all the sites," Puttfarcken told a briefing for French journalists Thursday.

While it's not the major revelation many originally thought, the news is still a step in the right direction for Airbus as it attempts to regain credibility for its oft-delayed A380 program.

The wiring issue stemmed from incompatible design specs used by Airbus' French and German plants -- harnesses made in one plant, did not line up with the fuselage segments produced by another. Airbus hopes to have a common design platform in place by the time the 26th airframe is manufactured.

Which means for the moment, Airbus will have to rework the problematic wiring harnesses on each airframe.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC