Weather Woes Push Dawn Launch To July 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 05, 2007

Weather Woes Push Dawn Launch To July 8

And Even Then, It Ain't Lookin' Good

More weather woes for NASA, this time affecting its delay-plagued Dawn spacecraft. A lightning advisory near Kennedy Space Center Thursday morning forced the space agency to scrub its plans to begin fueling the second-stage of the probe's United Launch Alliance Delta II booster rocket.

The delay in fueling pushes the launch date for Dawn to July 8, one day later than previously scheduled. NASA will again try to fuel the second stage Thursday afternoon; if the weather remains a concern, fueling will be performed Friday.

Lightning wasn't the only concern at the Cape. Also Thursday morning, the temperature within the fairing caused the required temperature of the second stage to be too warm for fueling to begin. The fairing temperature is being lowered by 10 degrees so that oxidizer loading can begin Thursday afternoon, if weather is acceptable.

The launch window on Sunday, July 8, extends from 4:04 to 4:33 pm EDT... but the chance of not meeting the launch weather criteria on Sunday is 60 percent, according to NASA.

These latest delays are but the latest to strike the problematic Dawn spacecraft, which NASA hopes will eventually be sent into the heavens to study the twin asteroids Ceres and Vesta, between Mars and Jupiter. Cancelled by the space agency due to cost overruns in early 2006, before being reinstated one month later, Dawn's planned June launch date was already moved off once, after a crane used to stack segments of the Delta II booster broke down.

A worker's wrench also fell on the spacecraft's solar panel during a procedure to prepare the spacecraft for spin-balance testing, though it did not damage any cells.

FMI: http://dawn.jpl.nasa.gov/

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC