Lockheed Martin Unveils Arrowhead System At Quad-A | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, May 10, 2005

Lockheed Martin Unveils Arrowhead System At Quad-A

Lockheed Martin, on behalf of Team Apache Systems LLC, will (ceremonially) deliver its first Modernized Target Acquisition and Designation Sight/Pilot Night Vision Sensor (M-TADS/PNVS), also known as Arrowhead, for the Apache AH-64 helicopter to the U.S. Army later today, May 10, 2005, during the Army Aviation Association of America's national convention in Orlando, FL.

Lockheed Martin's Arrowhead kit provides an advanced electro-optical targeting and pilotage system to Apache crews that will maximize safe flight in day, night and adverse-weather environments.

Arrowhead continues a 20-year legacy of serving as the eyes of the Army's Apache AH-64 attack helicopter with the first fielding of the current TADS/PNVS in 1983. Arrowhead's newly designed forward-looking infrared (FLIR) sensors use cutting-edge image processing techniques to give pilots the best possible resolution to avoid obstacles such as wires and tree limbs during low-level flight. The roll-out of the first Arrowhead kit in an M-TADS system under the Lot 1 contract comes almost twenty-three years to the day of signing the first TADS/PNVS production contract. Several retired officers from the 1983 contract signing were present today to witness the second generation fielding of the original system.

 

Arrowhead improves performance and reliability of the legacy TADS system by over 150%, reduces maintenance actions by nearly 60%, and enables two-level field maintenance—achieving a savings that approaches $1 billion in Army operation and support costs over the anticipated 20-year lifespan.

FMI: www.lmco.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC