US Navy Orders 3rd Phase Of P-8A Low-Rate Production, Bringing Total To 24 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Sep 25, 2012

US Navy Orders 3rd Phase Of P-8A Low-Rate Production, Bringing Total To 24

Boeing Receives $1.9 Billion Contract For 11 Poseidon Aircraft

The U.S. Navy has awarded Boeing a $1.9 billion contract for 11 P-8A Poseidon aircraft, which will take the total fleet to 24 and bolster the service's anti-submarine, anti-surface warfare and intelligence, surveillance and reconnaissance capabilities. This third low-rate initial production award announced Friday follows two last year that totaled 13 aircraft. Boeing has delivered three of the production P-8As, which are based on the company's Next-Generation 737-800 commercial airplane, and the Navy plans to purchase 117 to replace its P-3 fleet.

"This contract is a stepping stone to full-rate production, and our focus remains on building Poseidon on cost and on schedule," said Chuck Dabundo, Boeing vice president and P-8 program manager.
 
"It has been an exciting and productive year for the P-8A program," said Capt. Aaron Rondeau, P-8A deputy program manager for the Navy. "The fleet operators in Jacksonville are excited to have received their first three aircraft and look forward to the next delivery as they transition from the P-3 to the first P-8 fleet squadron."
 
Boeing assembles the P-8A aircraft in the same facility where it builds all its 737 aircraft. The Poseidon team uses a first-in-industry in-line production process that draws on Boeing's Next-Generation 737 production system. All P-8A-unique modifications are made in sequence during fabrication and assembly. After assembly, the aircraft enter Boeing's mission system installation and checkout facility for final modifications.
 
The Boeing-led team also has built and is testing six flight-test and two ground-test aircraft under a Navy System Development and Demonstration contract awarded in 2004. The test aircraft have completed more than 600 sorties and 2,500 flight hours to date.

FMI: www.boeing.com, www.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC