AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Aug 29, 2020

AD: The Boeing Company Airplanes

AD 2020-17-04 Required Installing Lanyard Assemblies On The Passenger Service Units

The FAA is superseding Airworthiness Directive (AD) 2019-03-06, which applied to certain The Boeing Company Model 737-300, -400, and -500 series airplanes.

AD 2019-03-06 required installing lanyard assemblies on the passenger service units (PSUs) and, for certain airplanes, on the life vest panels. This AD was prompted by a report indicating that the PSUs became separated from their attachments during several survivable accident sequences, and by the determination that additional actions are necessary for five airplanes. This AD retains the requirements of AD 2019-03-06 and also requires installation of lanyard assemblies on the life vest panels on those five airplanes. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective September 29, 2020.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to supersede AD 2019-03-06, Amendment 39-19558 (84 FR 5587, February 22, 2019) (“AD 2019-03-06”). AD 2019-03-06 applied to certain The Boeing Company Model 737-300, -400, and -500 series airplanes. The NPRM published in the Federal Register on March 9, 2020 (85 FR 13581). The NPRM was prompted by a report indicating that the PSUs became separated from their attachments during several survivable accident sequences, and by the determination that additional actions are necessary for five airplanes. The NPRM proposed to retain the requirement to install lanyard assemblies on PSUs and, for certain airplanes, on the life vest panels. The NPRM further proposed to require installing lanyard assemblies on the life vest panels for those five airplanes on which installation was not originally required. The FAA is issuing this AD to address the potential for the PSUs to detach and fall into the cabin, which could lead to passenger injuries and impede egress during an evacuation.

FMI: www.regulations.gov

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC