AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Sep 17, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-17-04

PRODUCT: Certain Airbus SAS Model A350-941 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-06-09, which applied to the aircraft listed above.

AD 2019-06-09 required repetitive tightness checks of the baby bassinet inserts installed on stowages and partitions and, depending on findings, accomplishment of applicable corrective actions, as specified in an EASA AD, which was incorporated by reference.

This new AD continues to require repetitive tightness checks of the baby bassinet inserts installed on stowages and partitions and, depending on findings, accomplishment of applicable corrective actions, and also requires modification of the baby bassinet inserts, which constitutes terminating action for the repetitive tightness checks; as specified in an EASA AD, which is incorporated by reference.

This AD was prompted by reports that baby bassinet inserts installed on airplane stowages and partitions were found loose because a self-securing fixation device (Loctite) had not been applied.

DATES: This AD becomes effective September 27, 2019. Comments must be received by October 28, 2019.

COST: The FAA estimates that this AD affects no affected U.S.-registered airplanes. If an affected airplane is imported and
placed on the U.S. Register in the future, operators may incur the following costs in order to comply with this AD:

Required Actions:

  • Retained actions from AD 2019-06-09: 1 work-hours × $85 per hour = $85.
  • New actions: Up to 3 work-hours × $85 per hour = Up to $255.

On Condition Costs:

  • Labor: 1 work-hour × $85 per hour = $85.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC