AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Jan 02, 2016

AD: Airbus Airplanes

AD NUMBER: 2015-25-06

PRODUCT: Certain Airbus Model A300 B2-1C, B2-203, B2K-3C, B4-103, B4-203, B4-2C airplanes; Model A310 series airplanes; Model A300 B4-600 series airplanes; and Model A300 B4-600R series airplanes.

ACTION: Final Rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2010-06-04, for the products listed above.

AD 2010-06-04 required repetitive inspections to detect cracks of the pylon side panels (upper section) at rib 8; and corrective actions if necessary.

This new AD continues to require repetitive inspections for cracking of the pylons 1 and 2 side panels (upper section) at rib 8 with reduced compliance times, and corrective actions if necessary. This AD also requires repetitive post-repair and post-modification inspections and repair if necessary.

This AD also removes certain airplanes having a certain modification from the applicability. This AD was prompted by reports of cracks found on pylon side panels at rib 8 and a fleet survey and updated fatigue and damage tolerance analyses.

The FAA is issuing this AD to detect and correct cracking of pylon side panels (upper section) at rib 8, which could lead to reduced structural integrity of the pylon primary structure, which could cause detachment of the engine from the fuselage.

DATES: This AD becomes effective February 2, 2016.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC