Pratt & Whitney F135 Engine Powers USS Wasp Sea Trials | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Jun 19, 2015

Pratt & Whitney F135 Engine Powers USS Wasp Sea Trials

F135 On Track For US Marine Corps F-35 Initial Operational Capability

Pratt & Whitney powered the first shipboard Marine Corps F-35B operational test from the USS Wasp from May 18-29 off the coasts of Virginia and North Carolina. Four F-35B aircraft from Marine Fighter Attack Squadron 121 and two F-35B aircraft from Marine Fighter Attack Squadron 501 performed more than 100 short takeoffs and vertical landings, with nearly flawless performance from the F135 propulsion system during the 10 day sea trials.

"We are delighted with the exceptional performance of the F135 during OT-1, and are proud to partner with the U.S. Marine Corp on this important program," said Mark Buongiorno, vice president, F135 Propulsion System, Pratt & Whitney. "OT-1's successful completion provides valuable insight and confidence in the engine as the Marine Corps Initial Operating Capability (IOC) approaches."

The Marines were able to safely execute day and night flight operations; conduct scheduled and unscheduled day and night maintenance activities; at sea-staging of engine and lift fan removal and installation; confirm the suitability of F-35B maintenance support equipment for shipboard operations; and prove the feasibility of the logistics footprint of a six-plane F-35B detachment aboard a U.S. Navy amphibious ship.

OT-1 also marked the first time that an F135 power module, the largest and heaviest part of the F-35B's engine, was transported using a shipping system designed and manufactured by Pratt & Whitney and RENO Machine Tool of Newington, CT. There was previously no way to transport replacement power modules.

Pratt & Whitney, in partnership with Bell Boeing, overcame the engineering and logistical obstacles of transporting the module and its specially designed protective carrier from shore to ship using an MV-22B Osprey. Combined, the two weigh nearly 9,000 pounds.

"With the declaration of USMC IOC rapidly approaching, the ability to conduct underway resupply of a F135 power module is crucial to F-35 logistical sustainment," said Lt. Gen. Jon Davis, U.S. Marine Corps Deputy Commandant for Aviation. "Furthermore, as the U.S. Navy replaces their Carrier On-Board Delivery aircraft with the V-22, this new capability will enable them to resupply all aircraft carriers and big deck amphibious carriers with both F-35B and F-35C power modules."

Lowering the power module to the ship's maintenance bay, and proving the ability to safely transfer the module was accomplished by personnel from Marine Operational Test and Evaluation Squadron 22.

"We know that we can now put a power module into an MV-22B and bring it out to an amphibious vessel," said Jeff Ward, who is in charge of F-35B deployment integration with Headquarters Marine Corps, in a US Marine Corps release. "We can now resupply the Marine Corps, Navy and Air Force in any environment by using the MV-22B. This is an important milestone for the program."

P&W powers the F-35 Lightning II with the F135 propulsion system which has logged more than 5,700 flights, 21,000 flight hours and more than 800 vertical landings. To date, Pratt & Whitney has delivered 228 F135 engines, including both System Design and Development and production engines.

(Images from file)

FMI: www.pratt-whitney.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC