Report: Boeing, SPEEA Talks Hit Turbulence | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Nov 13, 2008

Report: Boeing, SPEEA Talks Hit Turbulence

Company And Union Stall On Proposals

Even as Boeing struggles to bring its commercial aircraft production back up to speed after a 57-day strike by machinists, it faces another expiring contract with members of the Society of Professional Engineering Employees in Aerospace.

A few days ago, the word was a settlement was near. Now, that appears to have been overly optimistic.

The Seattle Post-Intelligencer cites a union source in reporting that despite a more active role by a federal mediator, the talks between Boeing and SPEEA hit turbulence Tuesday over incomplete responses from the company to union proposals.

The company's statement said all the non-economic issues have been resolved.

"Today Boeing and SPEEA negotiators reached a significant milestone in an afternoon main-table session," Boeing said. "Building on yesterday's accomplishments, we reached a tentative agreement on employment stabilization, which resolves the last noneconomic issue in these negotiations. We also continued discussions in other areas of the contracts, including vacation, sick leave and holidays."

However, union representatives don't agree. "We've made progress. However, there is still work to do," said SPEEA Executive Director Ray Goforth, adding the two sides haven't come to terms yet on medical benefits, pensions and compensation.

"In addition, Boeing continues to push for removal of Utah engineers from the professional contract," SPEEA said.

There are two SPEEA contracts at play, affecting a total of about 21,000 workers. Both expire December 1. While most affected workers are employed in the Puget Sound area, some work in Oregon, Utah and California. One acknowledged sticking point is Boeing's position that its employees in Utah should not be included in a new contract.

Boeing earlier said it would make its best and final offer to the union by Tuesday. That's now slipped to the end of this week, and even that prediction doesn't sound confident. The company was supposed to be starting talks today with 700 engineers based in Wichita, who have a contract which expires December 5. Those talks have now been pushed off to next week.

FMI: www.boeing.com, www.speea.org

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC