Babbitt Breaks Ground On New Las Vegas ATC Facility | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jun 01, 2011

Babbitt Breaks Ground On New Las Vegas ATC Facility

New Tower, Approach Control To Be Built At McCarran International

FAA Administrator Randy Babbitt helped break ground Tuesday for a new, $99 million air traffic control tower and radar approach control at McCarran International Airport. “This project will benefit passengers by enhancing safety and efficiency at the airport, while also providing good jobs for Nevada workers,” said U.S. Transportation Secretary Ray LaHood. “It’s good for the local economy, good for air traffic control and good for the airport.”

“The McCarran International Airport of today is a far cry from what it was when the current tower and TRACON were built,” Administrator Babbitt said. “This brand-new, modernized facility will give air traffic controllers better airfield views and help improve airport efficiency.”

The project includes a 352-foot-tall air traffic control tower and a 52,800-square-foot base building, which will house the Terminal Radar Approach Control (TRACON), air traffic control training simulators, administrative offices and equipment. The current control tower, which dates from the early 1980s, is about 200 feet tall, while the base building is 13,740 square feet. A taller tower is needed to provide controllers with better airfield views. Additionally, McCarran’s air traffic has increased dramatically since the current tower was built, creating a need for more controller space in both the tower and TRACON.

McCarran International Airport was the eighth-busiest U.S. airport in 2010 when it served more than 505,000 flights. The FAA forecasts more than 700,000 annual flights at McCarran by 2020.

The total project cost, including the installation of air traffic control equipment, electronics, power supplies, computers and heating and air conditioning is expected to be about $99 million. Construction will begin in June 2011 and is expected to be complete in the summer of 2013. The FAA plans to start using the new facility in early 2015, following the installation of electronics, air traffic control and computer equipment, heating and air conditioning, and other systems.

The new McCarran facility is the second major air traffic control construction project the FAA has undertaken in Nevada in recent years. In October 2010, the FAA commissioned a new air traffic control tower at Reno-Tahoe International Airport.

FMI: www.faa.gov
 

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC